Site Final | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 9/7/2005 | 9/7/2005 | 9/7/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Site Preparation | 12/31/2003 | 12/31/2003 | 12/31/2003 | A | PASS |
Steven Webb
|
|
|
|
Issue & PRINT permit COM | | | 12/8/2003 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/2/2003 | | 12/2/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 11/26/2003 | | 11/26/2003 | | FAIL |
|
|
|
Information to be included on ESC plans.
1. Listed BMP drawings to be included in plans
2. Discussion of Oil spill measures to be included
3. Discussion of EPA NOI requirements
4. Include a copy of EPA Const. Site SWPPP check list
5. Include a copy of Storm Water Construction General Permit Requirements
Contacted Plan Designer on 11/26/03
|
Routing - Erosion and Sediment | 9/25/2003 | | 9/25/2003 | | FAIL |
|
|
|
No ESC narrative attached to plans.
|
Application received | | | 9/11/2003 | | |
|
|
|
|