Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC03-01557
StatusFinaled
Name STEVE B DRESSER
Site Address 2430 N BOGUS BASIN RD
Project NameHighlands Village
Customer Number 
ePlanReview 
Description
talked to walt gann will take test in jan 14th/for now will put mike priest in as the responsible person/1/2/04/mls///Added Steve Dresser as a RP to this permit///11/03/04 BAS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled3/16/20173/16/20173/16/2017PPASS
DetailsAndy J. Long
old expired permit, no inspection
Tracking Control5/9/20055/9/20055/9/2005PPART
DetailsAimee Hughes
Contacted RP about maintaing construction entrance and the bmp's along Bogus Basin. concerned about flooding in parking lot. Will follow up this afternoon.
Tracking Control4/11/20054/11/20054/11/2005PPASS
DetailsAimee Hughes
Tracking Control3/21/20053/21/20053/21/2005APASS
DetailsAimee Hughes
site looks good. 3/22/2005 11:19:54 AM
Tracking Control11/29/200412/22/200412/22/2004APASS
DetailsAimee Hughes
BMP Violation12/8/200412/8/200412/8/2004APART
DetailsAimee Hughes
c/n issued, construction entrance is not up to standards. contacted RP. 12/8/2004 12:30:44 PM 12/8/2004 12:37:39 PM
Tracking Control11/10/200411/30/200411/30/2004APASS
DetailsAimee Hughes
site looks pretty good. will follow up. checked in with RP. 11/29/2004 10:22:25 AM
BMP Violation11/8/200411/10/200411/10/2004APASS
DetailsAimee Hughes
Met with Steve Dresser and walked site. All concerns on c/n have been addressed and site looks good. Will follow up. 11/10/2004 8:56:58 AM
BMP Violation11/3/200411/8/200411/8/2004AFAIL
DetailsAimee Hughes
c/n issued, contacted Steve Dresser (RP), must comply by end of the day tomorrow or stop work will be issued. 11/8/2004 10:07:05 AM
Site Preparation11/3/200411/3/200411/3/2004ANR
DetailsAimee Hughes
Steve spoke with Steve Dresser, he will be the new RP, he must be added to the permit by the end of the day and has until the end of the week to get in compliance with ordianance or further enforcement or stop work will occur. I will follow up on Monday 11/8/04. adh. 11/3/2004 9:44:14 AM
BMP Violation10/28/200410/29/200410/29/2004ADONE
DetailsAimee Hughes
BMP Violation10/28/200410/28/200410/28/2004AFAIL
DetailsSteven Webb
Talked to contractor -- need to install construction entrance and sweep roadways. 10/28/2004 11:22:27 AM
BMP Violation10/22/200410/22/200410/22/2004APART
DetailsAimee Hughes
track out needs be addressed, left message for RP, will follow up. 10/22/2004 10:39:37 AM
BMP Violation8/25/20048/26/20048/26/2004APASS
DetailsSteven Webb
John Lutman--###-####. Conference at 10:00 a.m. 8/25/2004 11:12:16 AM
Site Final8/26/20048/26/20048/26/2004ANR
DetailsSteven Webb
Conference8/23/20048/25/20048/25/2004PPART
DetailsSteven Webb
No plan on site, sediment barrier in question from last Friday, has been maintained, additions barrier maintance is needed plus modification to construction entrance. Will follow up. 8/25/2004 10:51:08 AM
Conference8/24/20048/24/20048/24/2004PPART
DetailsSteven Webb
RP has been changed to contractor doing the work. Need to have ESC plan on site for tomorrow's inspection. Maintain construction entrance. 8/24/2004 12:59:23 PM
Site Preparation8/23/20048/23/20048/23/2004PPART
DetailsSteven Webb
Left another message for rp, M. Priest. Informed them to return my call and we can set a time to get together on site and review the ESC plan. Will follow up. If no response further enforcement wil have to be performed. 8/23/2004 12:37:52 PM
Site Preparation8/20/20048/20/20048/20/2004APART
DetailsSteven Webb
left phone message for rp M. Priest and WR Gann. Discussed with contractor regarding BMP's located along creek which needs maintain. With forcasted rain this weekend this maintain is needed to prevent discharging of sediment from occurring. Will Follow up. 8/23/2004 12:35:59 PM
Tracking Control2/6/20042/6/20042/6/2004PCANC
DetailsSteven Webb
Cancelled by inspector--mistaken "add inspection" entry. 2/6/2004 2:12:21 PM
Issue & PRINT permit COM  1/5/2004 DONE
Routing - Erosion and Sediment12/23/2003 12/23/2003 PASS
ESC approved with conditions attached to plans.
Routing - Erosion and Sediment12/11/2003 12/11/2003 FAIL
ESC incomplete. Does not contain drawings of specified BMP's, does not address NOI requirements. Contacted PD.
Application received  11/25/2003