Site Final | 8/3/2006 | 8/3/2006 | 8/3/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Site Preparation | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | PASS |
Steven Webb
|
|
|
|
Issue & PRINT permit COM | | | 5/21/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/13/2004 | | 5/13/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 4/20/2004 | | 4/20/2004 | | FAIL |
|
|
|
ESC does not meet standards of BCC8-17 or Appendix A&C of Plan Designer Manual. No installation guidelines for selected BMP's, No RP inspection check list. Qualifies for NOI filing. Discussed with plan designer.
|
Routing - Erosion and Sediment | 4/19/2004 | | 4/19/2004 | | FAIL |
|
|
|
No ESC application, waiver letter, or plan submitted.
|
Application received | | | 4/9/2004 | | |
|
|
|
|