DOC - Permit Finaled | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Andy J. Long
|
|
|
old inactive permit still open removed from database
|
Routing - Erosion and Sediment | 5/5/2004 | | 5/5/2004 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Permit Ready to Issue | | | 5/5/2004 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 5/5/2004 | | DONE |
|
|
|
|
Application received | | | 5/3/2004 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/3/2004 | | 5/3/2004 | | FAIL |
|
|
|
ESC is not written for this project, RP listed is not certified by Boise City, RP check list is not site specific, Plans do not meet conditions of 8-17 or Appendix A&C of Plan Designer Manual. Drawings submitted are wrong size, only received 1 set of PP plans. Contacted Plan Designer.
|