Site Final | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Site Preparation | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PART |
Steven Webb
|
|
|
Informed rp that overall site is in compliance, my only comment was it would be a good idea to protect the strom drain inlet at the downhill curb cutout, this drains into the ditch down gradient of the parking lot. 11/18/2004 3:29:47 PM
|
Site Preparation | 10/18/2004 | 10/18/2004 | 10/18/2004 | A | PART |
Aimee Hughes
|
|
|
check for construction starting 10/18/2004 12:31:43 PM
|
Issue & PRINT to be Invoiced | | | 6/29/2004 | | |
|
|
|
|
(F) Reprint permit | | | 6/29/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/14/2004 | | 6/14/2004 | | PASS |
|
|
|
ESC waiver approved with conditions attached to plans.
|
Application received | | | 6/3/2004 | | |
|
|
|
|