DOC - Permit Finaled | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay.
|
Tracking Control | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay.contacted RP and developer about street sweeping.
|
Tracking Control | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Issue & PRINT permit SFD | | | 8/16/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/5/2004 | | 8/5/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions. Bown Crossing "master plan".
|
Application received | | | 7/27/2004 | | |
|
|
|
|