Permit Information
Permit NumberESC04-01055
StatusFinaled
Name CAMERON JAYO
Site Address 400 CLUBVIEW DR
Project NameSOMERSET RIDGE PHASE II
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/1/20112/1/20112/1/2011 DONE
DetailsClint A Smith
Permit finaled
DOC - Permit Finaled2/1/20112/1/20112/1/2011PPASS
DetailsClint A Smith
General Inspection1/17/20111/17/20111/18/2011 CANC
DetailsSteven Webb
holiday
General Inspection12/31/201012/31/20101/3/2011 CANC
DetailsSteven Webb
HOLIDAY
General Inspection12/16/201012/16/201012/16/2010 PART
DetailsClint A Smith
No threats present.
BMP Violation10/1/200910/6/200910/5/2009ADONE
DetailsClint A Smith
Spoke with RP (Cameron), over either stabiizing all slopes that area disturbed with no vegitation or install a sediment barrier along the bottom of the slope to the back of the sidewalk. Will check up here in 2 weeks.
BMP Violation8/7/200910/1/200910/1/2009AFAIL
DetailsClint A Smith
Message to RP: (Cameron)
Stabilize or install a sediment barrier on all disturbed slope on Pleasent Hill. Will follow-up on 10/06/09AM.
Random Inspection8/25/20098/25/20098/26/2009APART
DetailsSteven Webb
Work on failures has been performed but informed RP to stay up on entire subdivision and to make the necessary steps in preparation of fall and winter. Misc. areas are still in need of controls to reduce turbid runoff during rain events.
BMP Violation8/12/20098/21/20098/21/2009ACANC
DetailsClint A Smith
Moved until 8/24/09
Conference8/13/20098/17/20098/17/2009ACANC
DetailsClint A Smith
Did not recieve a time from RP.
General Inspection8/17/20098/17/20098/17/2009PFAIL
DetailsClint A Smith
Correction NOtice:
1. Provide a valid RP with day to fay control.
2. Remove stock pile off of the sidewalk (Right away).
3. Post ESC sign with all proper information at the front of the project.
Failure to comply will result in a stop work order. Will re-inspect on 8/1/8/09.
Complaint Inspection8/10/20098/12/20098/13/2009AFAIL
DetailsClint A Smith
Notified complaintee of the correction notice.
Left a message with RP
**Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Protect all slopes along Pleasent Hill Rd with a sediment barrier at the minimum.
Will re-inspect on 8/21/09AM.
Random Inspection8/7/20098/7/20098/7/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Re stabilish slopes olong the lots where gullies and rills have veen generated due to concentrated flows. Will re-inspect on 10/1/09.
BMP Violation5/11/20095/18/20095/12/2009APASS
DetailsClint A Smith
All sediment removed off of the property to the north. This is the complaintee's property.
BMP Violation5/6/20095/12/20095/11/2009ACANC
DetailsClint A Smith
mOVED TO 5/18/09
General Inspection4/10/20095/6/20095/6/2009AFAIL
DetailsClint A Smith
Message to RP: Cameron
Correction Notice:
Need to remove all silt fence within the east end of subdivision where no further work is occuring and vegitation is established.
Will re-inspect on 5/12/09
BMP Violation3/10/20094/10/20094/10/2009ACANC
DetailsSteven Webb
Follow up - Refer to last activitiy. Contact Cameron at ###-####: Cameron said old silt fence will be removed and/or maintaned shortly. Will follow up
General Inspection3/10/20093/10/20093/10/2009APART
DetailsSteven Webb
Toured site with Terry Records, overall site is under control. Verbal to Cameron with Jayo, to maintain or remove old silt fence mainly at the end of Ridgeline Road. Misc. area are still bare so additional seeding is recommended. Will follow up.
BMP Violation3/2/20093/6/20093/6/2009PPASS
DetailsClint A Smith
issue was corrected.
BMP Violation3/2/20093/2/20093/2/2009PCANC
DetailsClint A Smith
Wrong date.
Complaint Inspection3/2/20093/2/20093/2/2009AFAIL
DetailsClint A Smith
Verbal to Contractor:
Spoke with Shane Jayo over lot 44 Blk4 of the sub-division on erosion occuring on the lot where a gully is genterating from storm runoff of of the lot. Gave the contractor until 3/6/09am to install erosion and sediment control and to fix the gully cut on the slope of the lot down to the street. Will re-inspect on 3/6/09 PM.
Conference12/26/200612/27/200612/28/2006PPART
DetailsSteven Webb
Verbal corrections to rp
Conference12/26/200612/27/200612/27/2006PPART
DetailsAimee Hughes
Met with Camero Jayo to inspect subdivision and discuss bmp maintenance and inspection shedule. Steve Webb made some suggestions regarding mud and dirt track out from individual lots, access controls on several entrances, and some silt fence repairs. Will spend the afternoon of 12-28 inspecting individual residential lots.
Tracking Control1/25/20061/26/20061/26/2006APART
DetailsAimee Hughes
Responded to citizen complaint regarding mud and dirt trackout onto the street. I spoke with the RP and informed him that one correction notice would be given regarding mud and dirt trackout due to the number of violations last winter and then a Stop Work would be issued; however the site did not warrant a c/n today. Notified complaintant that I had visited the site.
Tracking Control1/10/20061/24/20061/25/2006ACANC
DetailsAimee Hughes
Site Preparation1/5/20061/10/20061/10/2006APASS
DetailsAimee Hughes
Site looks good. Bmp installation and maintenance recommendations have been applied. Will follow up.
Random Inspection1/3/20061/5/20061/5/2006PPART
DetailsSteven Webb
Phone #: ###-####: Walked site with contractor pointed out items which requires maintaince prior to this weekends projected storms. Will follow up on next Tuesday.
Conference1/3/20061/3/20061/3/2006PDONE
DetailsSteven Webb
Informed RP, Cameron that sediment basins requires maintaince if sediment built up is 1/2 depth of basin. Also, liquid needs to be pumped into a tanker and then offloaded at an acceptable location or pumped on site into vegetation if a large enough area is available. Also, any other maintance bmp's should be installed prior to next rain event. Will follow up. ; Phone #: ###-####
Random Inspection8/30/20059/6/20059/8/2005ADONE
DetailsSteven Webb
Follow up on fees? Cameron ###-####. Cameron stated that he does not believe the fee was ever paid, he will be in yet this week to pay the fee.
Issue & PRINT permit COM  9/8/2005 DONE
Conference8/30/20058/30/20058/30/2005PPART
DetailsSteven Webb
Reviewed soil stablization including tackifier, re-vegetation, retention basins, other structual bmps with G. Smith D. Jayo, C. Jayo and T. Records. Will follow up.
(F) Reprint permit  8/30/2005  
Tracking Control3/28/20053/28/20053/28/2005APASS
DetailsAimee Hughes
site looks fine at both entrances. will follow up. 3/28/2005 9:55:30 AM
Tracking Control1/26/20051/26/20051/26/2005APASS
DetailsAimee Hughes
site looks okay. talked to RP about repairing construction entrance on ridgeview entrance. will follow up. 1/26/2005 11:22:50 AM
Tracking Control12/21/200412/21/200412/21/2004APART
DetailsSteven Webb
Received complaint regarding mud track out relating to project, informed RP that a complaint had been made. RP said he would inspect construction entrances and if necessary would clean up. 12/21/2004 9:56:31 AM
Conference10/18/200410/20/200410/20/2004APART
DetailsSteven Webb
Cameron -- Site Inspection 9:00 a.m. Overall things appear good. Minimal mud track out. Recommended contractor provide a better gravel surface to park and stage supplies and park vehicles. 10/20/2004 9:25:47 AM
Tracking Control9/27/20049/27/20049/27/2004APART
DetailsAimee Hughes
drove by site, track out looks okay.
Tracking Control9/16/20049/21/20049/20/2004APART
DetailsAimee Hughes
spoke with RP (Cameron) site looks okay, needs to be swept daily or as needed 9/21/2004 10:29:46 AM
Tracking Control9/16/20049/21/20049/20/2004APART
DetailsAimee Hughes
spoke with RP (Cameron) site looks okay, needs to be swept daily or as needed 9/21/2004 10:29:46 AM
Tracking Control9/16/20049/16/20049/16/2004PPART
DetailsAimee Hughes
left a message for RP (Cameron) about track out, there was a sweeper truck there, but will follow up.
Site Preparation8/17/20048/26/20048/26/2004PPART
DetailsSteven Webb
Shane ###-#### 8/26/2004 9:26:25 AM
Conference8/17/20048/17/20048/17/2004ADONE
DetailsSteven Webb
Shane
Conference8/17/20048/17/20048/17/2004ADONE
DetailsSteven Webb
Shane
Application received  8/6/2004  
Routing - Erosion and Sediment8/6/2004 8/6/2004 PASS
ESC plan approved with attached conditions. Plans taken to T. Records--Hillside
Routing - Erosion and Sediment8/6/2004   PEND