Information based on query as of Saturday, July 6, 2024.
Permit Information
Permit NumberESC04-01247
StatusFinaled
Name DAVID BASHISTE
Site Address 1501 S FEDERAL WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/30/200611/30/200611/30/2006PPASS
DetailsAimee Hughes
BMP Violation3/23/20053/25/20053/25/2005PPART
DetailsSteven Webb
BMP Violation3/22/20053/23/20053/23/2005APART
DetailsSteven Webb
Informed rp that additional measures are needed, sediment barrier and access controls are most critical. Will follow up. 3/23/2005 1:54:41 PM
BMP Violation3/22/20053/22/20053/22/2005PFAIL
DetailsSteven Webb
Correction Notice issued to rp. Not following ESC plan and conditions of permit. Complete all provisions by the end of the day or a stop work order will be issued. Notified RP via phone. Will follow up. 3/22/2005 1:29:37 PM
Tracking Control1/27/20051/27/20051/27/2005AFAIL
DetailsSteven Webb
Citizen Complaint regarding mud trackout onto hard surfaces. ACHD called me that a complaint was given to him. I informed RP to address now, (raining currently) or a stop work will be issued this afternoon. Will follow up. 1/27/2005 10:11:48 AM
Tracking Control1/27/20051/27/20051/27/2005PPASS
DetailsSteven Webb
Provision in place, need to maintain to achieve MEP. 1/28/2005 3:07:21 PM
Tracking Control1/10/20051/10/20051/10/2005PPART
DetailsSteven Webb
Minor trackout but could expand if cut out areas across hard surfaces are not graveled. Informed RP what I observed and he stated he would take care of this. 1/10/2005 2:05:55 PM
BMP Violation11/18/200411/18/200411/18/2004PPART
DetailsSteven Webb
Verbal correction to rp--signage, sweeping of hard surfaces, sediment barrier will be needed along overland if veg. is removed along overland road. 11/18/2004 2:48:17 PM
Site Preparation11/3/200411/5/200411/5/2004APASS
DetailsSteven Webb
Site Preparation11/3/200411/3/200411/3/2004AFAIL
DetailsSteven Webb
Issued stop work on 11/1/04 due to working without a permit. Worked with Engineer and contractor to resolve situation. 11/3/2004 8:40:05 AM
Site Preparation11/3/200411/3/200411/3/2004APART
DetailsSteven Webb
Stop work lifted, will follow up to see if plan bmp's have been implemented. 11/3/2004 3:38:57 PM
Issue & PRINT permit COM  11/3/2004 DONE
Routing - Erosion and Sediment9/28/2004 9/28/2004 PASS
approved with attached conditions. Must have RP listed on permit before construction begins.
Application received  9/17/2004