DOC - Permit Finaled | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 4/20/2005 | 4/20/2005 | 4/20/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 1/24/2005 | 1/24/2005 | 1/24/2005 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 1/24/2005 | 1/24/2005 | 1/24/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks fine. 1/24/2005 10:24:20 AM
|
Conference | 12/14/2004 | 12/15/2004 | 12/15/2004 | A | PASS |
Aimee Hughes
|
|
|
met with RP and inspected per ESC plans. site was fine and BMP's were installed correctly and being maintained. 12/15/2004 1:57:25 PM
|
Conference | 12/14/2004 | 12/14/2004 | 12/14/2004 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 12/8/2004 | 12/8/2004 | 12/8/2004 | A | PART |
Aimee Hughes
|
|
|
left a message for RP, permit needs to be updated with current RP, gravel bag needs to be placed as well. 12/8/2004 11:34:20 AM
|
Site Preparation | 10/28/2004 | 11/10/2004 | 11/10/2004 | P | PASS |
|
|
|
site looks okay, BMP's are being maintained 11/10/2004 3:37:27 PM 11/10/2004 3:37:51 PM
|
Site Preparation | 10/28/2004 | 10/28/2004 | 10/28/2004 | A | PASS |
Aimee Hughes
|
|
|
site looks okay, spoke to RP.
Received 48-hour notice 10/28/2004 9:20:40 AM 10/28/2004 2:42:18 PM
|
Issue & PRINT permit SFD | | | 10/21/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/5/2004 | | 10/5/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 9/24/2004 | | |
|
|
|
|