DOC - Permit Finaled | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 1/17/2006 | 1/31/2006 | 1/31/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay. Contacted RP about watching trackout during wet weather.
|
Tracking Control | 10/10/2005 | 10/24/2005 | 10/24/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks fine.
|
Tracking Control | 9/26/2005 | 10/10/2005 | 10/10/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Random Inspection | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Random Inspection | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay.
|
Tracking Control | 5/23/2005 | 5/23/2005 | 5/23/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay, minimal trackout, contacted RP.
|
Tracking Control | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay.
|
Routing - Erosion and Sediment | 5/4/2005 | | 5/4/2005 | | PASS |
|
|
|
ESC plan for pool approved with attached conditions.
|
Tracking Control | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks okay.contacted RP and developer about street sweeping.
|
Tracking Control | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PASS |
Aimee Hughes
|
|
|
|
Conference | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | DONE |
Steven Webb
|
|
|
RP changed from past RP. 2/15/2005 12:39:37 PM
|
Site Preparation | 2/11/2005 | 2/11/2005 | 2/11/2005 | A | FAIL |
Steven Webb
|
|
|
Received letter from RP--Roger Bradford, no longer assuming responsibility for this esc permit. Notified permittee, providing 24 hours to get certified RP on permit or per BMC 8-17 a Stop Work Order will be issued. Will follow up 2/11/2005 9:49:03 AM
|
Issue & PRINT permit SFD | | | 12/7/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/16/2004 | | 11/16/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions. Approved for structure but not for pool. ESC additional details required for dewatering of the pool excavation prior to issuance of a esc permit.
|
Application received | | | 11/2/2004 | | |
|
|
|
|