Site Final | 2/2/2009 | 2/2/2009 | 2/2/2009 | P | PASS |
James Rogers
|
|
|
|
Tracking Control | 7/20/2005 | 8/3/2005 | 8/3/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks okay.
|
Tracking Control | 7/6/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Aimee Hughes
|
|
|
Straw wattles have been staked in and sign is posted. Will follow up.
|
BMP Violation | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | CANC |
Steven Webb
|
|
|
Aimee is re-inspecting
|
BMP Violation | 7/15/2005 | 7/19/2005 | 7/19/2005 | A | PART |
Steven Webb
|
|
|
Follow up: Additional wattle in place but not staked down, sign on ground. Bob RP-###-####. Will follow up
|
BMP Violation | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | FAIL |
Steven Webb
|
|
|
Correction to rp, additional wattles needed on downhill side, stake and maintain existing wattles, post sign in better location.
|
Complaint Inspection | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | FAIL |
Aimee Hughes
|
|
|
Responded to complaint about concrete wash-out being done into street. Saw no evidence of that, but reminded RP to use designated washout area, needs to install D/I protection and trash container is needed on site.
|
Issue & PRINT permit SFD | | | 5/31/2005 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 5/5/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/22/2005 | | 4/22/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 2/7/2005 | | |
|
|
|
|