Site Final | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 10/3/2006 | 10/23/2006 | 10/25/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay, talked to RP about some minimal trackout and stabilizing the slope at the front of the property.
|
Tracking Control | 10/9/2006 | 10/9/2006 | 10/11/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 10/3/2006 | 10/3/2006 | 10/3/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
BMP Violation | 8/18/2006 | 8/18/2006 | 8/18/2006 | A | PART |
Steven Webb
|
|
|
Verbal correction to rp
|
Conference | 11/4/2005 | 11/4/2005 | 11/4/2005 | P | DONE |
Steven Webb
|
|
|
|
Site Preparation | 10/25/2005 | 11/2/2005 | 11/2/2005 | P | PART |
Steven Webb
|
|
|
Joe-###-####
|
Conference | 10/24/2005 | 10/24/2005 | 10/24/2005 | A | DONE |
Steven Webb
|
|
|
Received 48 hour notice
|
Issue & PRINT permit SFD | | | 10/19/2005 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 10/19/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/18/2005 | | 7/18/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 2/17/2005 | | |
|
|
|
|