Site Final | 8/3/2006 | 8/3/2006 | 8/3/2006 | P | PASS |
Aimee Hughes
|
|
|
|
Random Inspection | 8/25/2005 | 8/25/2005 | 8/25/2005 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address access control needed on McKinney and the construction entrance called for in the plan on Allumbaugh needs to be used and maintained. ESC sign must be re-posted at main entrance.
|
Override - Parcel Holds | | | 7/11/2005 | | |
|
|
|
|
Issue & PRINT permit COM | | | 7/11/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/5/2005 | | 5/5/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 4/27/2005 | | 4/27/2005 | | FAIL |
|
|
|
ESC plan needs to address final stablization. Informed PD
|
Application received | | | 4/14/2005 | | |
|
|
|
|