Site Final | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 5/2/2006 | 5/23/2006 | 5/23/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/12/2006 | 5/2/2006 | 5/2/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 4/10/2006 | 4/11/2006 | 4/12/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. bmp's are being maintained.
|
Conference | 12/28/2005 | 12/28/2005 | 12/28/2005 | P | PASS |
Aimee Hughes
|
|
|
Spoke with RP about installation of water line. Job is on hold due to wet weather. RP will notify me when job is underway.
|
Random Inspection | 12/28/2005 | 12/28/2005 | 12/28/2005 | P | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 7/21/2005 | 8/4/2005 | 8/3/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks good.
|
Random Inspection | 7/21/2005 | 7/21/2005 | 7/21/2005 | P | PART |
Aimee Hughes
|
|
|
talked to RP about updating construction entrance at villa ridge and maintaing the d/i protection on arrow villa. will follow up.
|
Tracking Control | 7/19/2005 | 7/19/2005 | 7/20/2005 | P | CANC |
Aimee Hughes
|
|
|
|
Random Inspection | 6/14/2005 | 6/21/2005 | 6/27/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks good.
|
Random Inspection | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PART |
Aimee Hughes
|
|
|
c/n issued to address construction entrances, they are not meeting MEP, met with new RP to inspect to approved ESC plan. will follow up.
|
Complaint Inspection | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | PART |
Aimee Hughes
|
|
|
responded to citizen complaint on 6/10 regarding trackout. looked okay on 6/10. contacted RP wil follow up.
|
BMP Violation | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | FAIL |
Aimee Hughes
|
|
|
responded to citizen complaint, trackout from new phase to eryrie rd. needs to be maintained and prevented, c/n issued to address trackout, costruction entrance improvement and daily sweeping. contacted RP. will follow up.
|
Issue & PRINT permit SFD | | | 5/25/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/27/2005 | | 4/27/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/27/2005 | | |
|
|
|
|
Telephone call | | | 4/27/2005 | | DONE |
|
|
|
left mess for colin connell at ###-#### is ready
|
Routing - Erosion and Sediment | 4/25/2005 | | 4/25/2005 | | FAIL |
|
|
|
ESC not per 8-17, need full size drawings, etc. Informed PD.
|
Application received | | | 4/22/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/22/2005 | | | | PEND |
|
|
|
|