DOC - Permit Finaled | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 10/4/2005 | 10/18/2005 | 10/18/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks fine.
|
Random Inspection | 10/4/2005 | 10/4/2005 | 10/4/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. Talked to RP about maintaining construction entrance.
|
Tracking Control | 5/18/2005 | 5/18/2005 | 5/18/2005 | P | PASS |
Aimee Hughes
|
|
|
site looks fine. bmp's are being maintained.
|
Issue & PRINT permit COM | | | 5/2/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/29/2005 | | 4/29/2005 | | PASS |
|
|
|
ESC re-submittals received and plan passed with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2005 | | DONE |
|
|
|
Called Jim and Scott that permit is ready.
|
Routing - Erosion and Sediment | 4/25/2005 | | 4/25/2005 | | FAIL |
|
|
|
Plan does not comply with BMC 8-17; final stablization measures are needed on narrative. Informed PD
|
Application received | | | 4/22/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/22/2005 | | | | PEND |
|
|
|
|