Site Final | 5/13/2010 | 5/17/2010 | 5/17/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | PART |
Steven Webb
|
|
|
Informed rp that signage is needing signature lines re-written; Concrete swale will need to be watched during upcoming time frame to ensure that sediment doesn't get released and carried to river. Drop inlet in parking lot in need of cleaning.
|
Random Inspection | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PART |
Steven Webb
|
|
|
Erik-###-####: Need d.inlet cleaned.
|
Site Preparation | 7/18/2005 | 7/19/2005 | 7/21/2005 | A | PART |
Steven Webb
|
|
|
Follow up
|
Site Preparation | 7/18/2005 | 7/18/2005 | 7/18/2005 | A | FAIL |
Steven Webb
|
|
|
Stop work; No sign of a esc plan being implemented. No signage, no bmp's. Contracotor could not produce permit.
|
Tracking Control | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | DONE |
Steven Webb
|
|
|
Stop work lifted esc permit picked up at city hall. Informed RP to post sign and install other bmp's as plan outlined plus sediment barrier is needed across drainage swale. Will follow up
|
Issue & PRINT permit COM | | | 7/18/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/9/2005 | | 5/9/2005 | | |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 4/28/2005 | | |
|
|
|
|