Aging Inspection | 1/3/2011 | 1/3/2011 | 1/4/2011 | | DONE |
Troy James
|
|
|
|
DOC - Permit Finaled | 1/4/2011 | 1/4/2011 | 1/4/2011 | P | PASS |
Troy James
|
|
|
|
Random Inspection | 11/28/2005 | 11/28/2005 | 11/29/2005 | P | PART |
Steven Webb
|
|
|
Correction to rp
|
Tracking Control | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | PART |
Steven Webb
|
|
|
Verbal to rp: maintain drop inlets, move vehicles off bare dirt before rain event happens. Allen Degen ###-####.
|
BMP Violation | 8/25/2005 | 8/29/2005 | 8/29/2005 | P | PASS |
Steven Webb
|
|
|
Items on prior c/notice taken care of. Sweep daily or as needed.
|
Random Inspection | 8/25/2005 | 8/25/2005 | 8/25/2005 | P | FAIL |
Steven Webb
|
|
|
C/Notice posted on job site; Complete all items by the end of the weekend or further enforcement will occur.
|
Tracking Control | 7/19/2005 | 7/21/2005 | 7/25/2005 | A | PASS |
Steven Webb
|
|
|
|
Tracking Control | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PART |
Steven Webb
|
|
|
Follow up: Contractor was working on entrance at time of inspection. Entrance looks good, but still needs to construction curb ramp. Will follow up
|
Tracking Control | 7/15/2005 | 7/18/2005 | 7/18/2005 | P | FAIL |
Steven Webb
|
|
|
Construction entrance: Work not completed per request, will follow up Tues. a.m; if not completed written correction will be issued.
|
BMP Violation | 7/14/2005 | 7/15/2005 | 7/15/2005 | P | PART |
Steven Webb
|
|
|
Re-inspection: Brad, still needs better construction entrance, sweep hardsurface. Wattle was placed where needed. Will reinspection Monday, 7/18/05.
|
BMP Violation | 7/14/2005 | 7/14/2005 | 7/14/2005 | P | PART |
Steven Webb
|
|
|
Correction to rp--need to rebuild construction entrance, sweep hardsurfaces, clean out and re-install drop inlet protection. Install sediment barriers behind sidewalk where needed. Will Follow up.; Phone #: ###-####
|
Routing - Erosion and Sediment | 5/13/2005 | | 5/13/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Issue & PRINT permit SFD | | | 5/13/2005 | | DONE |
|
|
|
|
Application received | | | 5/5/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/5/2005 | | 5/5/2005 | | FAIL |
|
|
|
ESC does not cover final stablization measures, informed PD via voice mail. An addendum will be needed.
|