Site Final | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | CANC |
Aimee Hughes
|
|
|
Duplicated inspection.
|
Tracking Control | 5/9/2006 | 5/30/2006 | 5/30/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/18/2006 | 5/9/2006 | 5/9/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 4/18/2006 | 4/18/2006 | 4/18/2006 | P | CANC |
Aimee Hughes
|
|
|
Construction has not started yet.
|
Tracking Control | 3/7/2006 | 3/28/2006 | 3/28/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 3/7/2006 | 3/7/2006 | 3/7/2006 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. ESC sign needs to be reposted, and d/i protection needs maintained. must be completed by the end of the day or a stop work may be issued.
|
Tracking Control | 2/14/2006 | 2/14/2006 | 2/14/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 11/2/2005 | 11/16/2005 | 11/18/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, issues on c/n have been addressed.
|
BMP Violation | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. trash and debris on site and in gutters needs to be cleaned up and maintained.
|
Issue & PRINT permit SFD | | | 6/28/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/15/2005 | | 6/15/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 6/6/2005 | | |
|
|
|
|