Site Final | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Random Inspection | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about sweeping sidewalks.
|
Tracking Control | 9/1/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Aimee Hughes
|
|
|
site looks good.
|
Tracking Control | 8/19/2005 | 9/2/2005 | 9/1/2005 | A | PART |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about watching trackout at the end of the day: concrete is being poured.
|
Complaint Inspection | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | PASS |
Aimee Hughes
|
|
|
Responded to citizen complaint about dust on construction site. Met with RP to discuss bmp's and dust abatement. Will follow up.
|
Application received | | | 6/7/2005 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 6/7/2005 | | DONE |
|
|
|
|