Site Final | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 10/19/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Steven Webb
|
|
|
|
Random Inspection | 10/19/2005 | 10/19/2005 | 10/19/2005 | P | PART |
Steven Webb
|
|
|
Voice mail to rp--D. Mc. Need acceptable cons. entrance. Dust measures needed. Will follow up.
|
BMP Violation | 10/10/2005 | 10/12/2005 | 10/12/2005 | A | PASS |
Aimee Hughes
|
|
|
Met with RP to inspect to approved ESC plan and check issues on previous c/n. Site looks fine.
|
BMP Violation | 10/10/2005 | 10/10/2005 | 10/10/2005 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address Construction Entrance not being adequate to prevent trackout, must be installed as called for in plan. Will reinspect on 10-12, left message for RP.
|
Random Inspection | 7/26/2005 | 7/26/2005 | 7/26/2005 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. Responded to concern that construction entrance was too deep, talked to RP and he will remove some of the rock today.
|
Site Preparation | 7/6/2005 | 7/7/2005 | 7/7/2005 | P | PART |
Aimee Hughes
|
|
|
Got in touch with the RP regarding c/n, all issues are being addressed and will be completed by 7-7-05.
|
Random Inspection | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | PART |
Aimee Hughes
|
|
|
grading has started, no sign posted, no construction entrance, contacted RP will follow up.
|
Issue & PRINT permit COM | | | 6/29/2005 | | DONE |
|
|
|
|
Application received | | | 6/23/2005 | | |
|
|
|
|