Permit Information
Permit NumberESC05-01109
StatusFinaled
Name ADRIAN MARRIAGE
Site Address 11101 W FAIRVIEW AVE Unit: #59
Project NameKEENELAND PARK SUB
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection1/20/20111/20/20111/20/2011 DONE
DetailsClint A Smith
Permit finalled.
DOC - Permit Finaled1/20/20111/20/20111/20/2011PPASS
DetailsClint A Smith
Site Final3/3/20083/3/20083/3/2008PFAIL
DetailsJames Rogers
Vacant sites have trash and construction debris on them and have not been stablized. Some dirt trackout.
Tracking Control5/22/20066/5/20066/7/2006ACANC
DetailsAimee Hughes
Tracking Control4/24/20065/22/20065/22/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control4/3/20064/24/20064/24/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control3/14/20064/4/20064/3/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control3/14/20063/14/20063/14/2006PFAIL
DetailsAimee Hughes
verbal c/n to RP. construction entrance is no longer adequate for preventing trackout. maintenance is needed to maintain MEP and for preventing trackout onto Fairview.
Tracking Control11/3/200511/24/200511/25/2005ACANC
DetailsAimee Hughes
Site Preparation11/3/200511/3/200511/3/2005APASS
DetailsAimee Hughes
Received 48 hr. notice. Met with RP to inspect to approved ESC plan. Discussed dust control and construction entrance installation. Site looks good.
Issue & PRINT permit COM  8/30/2005 DONE
Telephone call  8/2/2005 DONE
called Bob Unger at ###-####
Routing - Erosion and Sediment8/1/2005 8/1/2005 PASS
Received (2) copies of ESC Narrative and (2) copies of sheet ESC-0, ESC-1, ESC-2, ESC-3, C003, C004 and C005. ESC plan approved with attached conditions. RP to be determined.
PLANS/APPL TAKEN TO FRONT DESK  8/1/2005 DONE
Routing - Erosion and Sediment7/7/2005 7/7/2005 FAIL
ESC plan does not meet requirments set forth in BMC 8-17. Checklist completed and faxed to PD.
Application received  6/30/2005  
Routing - Erosion and Sediment6/30/2005   PEND