Site Final | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PASS |
Aimee Hughes
|
|
|
Subdivision looks good. Talked to RP about posting a few ESC signs that were missing and the street sweeping shedule.
|
Tracking Control | 11/16/2005 | 11/30/2005 | 12/2/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks better. Trackout is being maintained.
|
Conference | 11/16/2005 | 11/16/2005 | 11/16/2005 | P | PART |
Aimee Hughes
|
|
|
Met with RP to discuss complaint regarding heavy trackout and lack of bmp's in subdivision. Street sweeping will be done weekly and more if needed. Signs will be posted and RP will be added to permits.
|
BMP Violation | 11/15/2005 | 11/15/2005 | 11/15/2005 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP about heavy trackout and sediment on site. RP listed on sign is not certified, must get IRP. will follow up with conference tomorrow morning.
|
Issue & PRINT permit SFD | | | 10/13/2005 | | DONE |
|
|
|
|
Application received | | | 8/9/2005 | | |
|
|
|
|