Aging Inspection | 1/20/2011 | 1/20/2011 | 1/20/2011 | | DONE |
Clint A Smith
|
|
|
Permit finalled.
|
DOC - Permit Finaled | 1/20/2011 | 1/20/2011 | 1/20/2011 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 11/3/2005 | 11/24/2005 | 11/28/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks fine.
|
Tracking Control | 10/6/2005 | 11/3/2005 | 11/3/2005 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 9/22/2005 | 10/6/2005 | 10/6/2005 | A | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 9/1/2005 | 9/22/2005 | 9/22/2005 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. Starting to put road in. Spoke with RP.
|
Site Preparation | 8/29/2005 | 9/1/2005 | 9/1/2005 | A | PART |
Aimee Hughes
|
|
|
Site looks good. Met with RP to inspect to approved ESC plans. Will follow up.
|
Routing - Erosion and Sediment | 8/25/2005 | | 8/25/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2005 | | DONE |
|
|
|
tlk to secretary superior con ###-#### that permit is ready to be picked up
|
Issue & PRINT permit COM | | | 8/25/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/16/2005 | | 8/16/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements per BMC 8-17 and plan designer manual. Checklist completed and faxed to Mr. Gilbert.
|
Application received | | | 8/10/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/10/2005 | | | | PEND |
|
|
|
|