Permit Information
Permit NumberESC05-01473
StatusFinaled
Name ROBIN LABRIE
Site Address 230 E BOISE AVE
Project NameBRIDGEWALK SUB (x-ref SUB04-89
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Random Inspection3/25/20103/25/20103/25/2010PPASS
DetailsBill VanDegrift
Site Final3/25/20103/25/20103/25/2010PPASS
DetailsBill VanDegrift
Tracking Control4/28/20064/28/20064/28/2006PCANC
DetailsAimee Hughes
Site Preparation12/9/200512/16/200512/19/2005PPART
DetailsSteven Webb
BMP Violation11/29/200512/8/200512/9/2005PPART
DetailsSteven Webb
Conference11/28/200511/29/200511/29/2005PPART
DetailsSteven Webb
Meet Ms Labrie on project site at 1:30 pm. Some additional corrections on the project, other items added which are needed on project site.
BMP Violation11/28/200511/28/200511/28/2005PPASS
DetailsSteven Webb
Access controls behind sidewalk are in place, (fence). Continue to keep in place throughout construction project. Also, the construction entrance is installed. Maintain as needed. Sweep daily or as needed. Will follow up.
Routing - Erosion and Sediment11/23/2005 11/23/2005 FAIL
Correction to rp; No construction entrance, no access control from hard surface to construction site. Informed rp to 1) Install construction entrance, 2) sweep street & sidewalk and 3) install steel post with fence or rope to provide access control. Complete by end of this weekend (11/27/05) or a stop work order will be issued Monday (11/28/05) morning.
Tracking Control11/2/200511/4/200511/7/2005APASS
DetailsAimee Hughes
Top dressing has been added to construction entrance. Access control will be completed as soon as top soil is delivered.
Tracking Control11/2/200511/2/200511/2/2005PPART
DetailsSteven Webb
Top dressing is needed on construction entrance. Access control (fence) needs to be installed behind sidewalk, east of existing cons. entrance. Informed RP. Will follow up.
Site Preparation9/14/20059/19/20059/19/2005PPASS
DetailsSteven Webb
follow up inspection: Correction ok but sign still needs to be moved to main entrance and better access control--fence. Sweep daily or as needed.
Site Preparation9/14/20059/14/20059/14/2005PFAIL
DetailsSteven Webb
Correction notice posted on site; complete all items by the end of the weekend or a storp work can be issued. Will follow up the afternoon of 9/19/05.
Override - Parcel Holds  9/14/2005  
Override - Parcel Holds  9/14/2005  
Site Preparation9/6/20059/6/20059/6/2005 DONE
Received 48 hour notice to start construction.
(F) Reprint permit  9/6/2005  
Override - Parcel Holds  9/6/2005  
Override - Parcel Holds  8/31/2005  
Permit Ready to Issue  8/31/2005 DONE
Telephone call  8/31/2005 DONE
lft vm with brett labrie that esc and fees are ready to be picked up
Override - Parcel Holds  8/31/2005  
Issue & PRINT permit COM  8/31/2005  
Routing - Erosion and Sediment8/30/2005 8/30/2005 PASS
ESC plan approved with attached conditions.
Application received  8/29/2005  
Routing - Erosion and Sediment8/29/2005   PEND