Site Final | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Site Final | 6/21/2007 | 6/21/2007 | 6/21/2007 | P | FAIL |
Steven Webb
|
|
|
Lot of bare soil remains on site. Needs final stablization.
|
Tracking Control | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Complaint Inspection | 3/3/2006 | 3/3/2006 | 3/3/2006 | P | PART |
Aimee Hughes
|
|
|
Responded to citizen complaint regarding trash on site. No visible trash problem, but ESC sign was not posted. Contacted RP and complaintant.
|
Issue & PRINT permit COM | | | 1/31/2006 | | DONE |
|
|
|
|
Tracking Control | 10/18/2005 | 11/8/2005 | 11/9/2005 | A | CANC |
Aimee Hughes
|
|
|
|
Site Preparation | 10/6/2005 | 10/19/2005 | 10/18/2005 | | PASS |
Aimee Hughes
|
|
|
Site looks good. Grading has been completed.
|
Routing - Erosion and Sediment | 10/6/2005 | | 10/6/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions. Still need rp prior to start of construction.
|
Routing - Erosion and Sediment | 9/1/2005 | | 9/1/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements set forth in BMC 8-17 or plan designer manual. Checklist completed and faxed to PD. Also, contractor called out which means a rp needs to be included on the esc application.
|
Application received | | | 8/29/2005 | | |
|
|
|
|