Site Final | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | FAIL |
Clint A Smith
|
|
|
The commen lot has not been stabilized that is across the street from the project. (Across Anderson) CAS #460
|
Site Final | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 12/14/2005 | 1/4/2006 | 1/4/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Site Preparation | 12/6/2005 | 12/13/2005 | 12/14/2005 | P | PASS |
Aimee Hughes
|
|
|
Construction has started. Sited looks okay. BMP's are in place. Contacted RP about posting ESC sign and making sure that construction entrance is utilized at all times.
|
Issue & PRINT permit COM | | | 12/1/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/7/2005 | | 11/7/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 9/21/2005 | | 9/21/2005 | | FAIL |
|
|
|
ESC plan does not meet requirements per BMC 8-17; notified PD via phone and faxed checklist.
|
Application received | | | 9/15/2005 | | |
|
|
|
|