Aging Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 1/18/2010 | 1/18/2010 | 1/18/2010 | | CANC |
Clint A Smith
|
|
|
|
Tracking Control | 4/17/2006 | 5/8/2006 | 5/9/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 3/27/2006 | 4/17/2006 | 4/17/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. bmp's are being maintained.
|
Tracking Control | 3/6/2006 | 3/27/2006 | 3/27/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 2/13/2006 | 3/6/2006 | 3/6/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Site Preparation | 2/8/2006 | 2/10/2006 | 2/13/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. Construction is just starting, bmp's are in place. There is some trackout in front of site, but it is from the road extension project, not Irish Auto.
|
Random Inspection | 2/8/2006 | 2/8/2006 | 2/13/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Issue & PRINT permit COM | | | 1/26/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/1/2005 | | 11/1/2005 | | FAIL |
|
|
|
No rp on application. Informed applicant via voice mail
|
Routing - Erosion and Sediment | 11/1/2005 | | 11/1/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 10/12/2005 | | 10/12/2005 | | FAIL |
|
|
|
General contractor is called out but the rp listed is not certified by Boise City. Informed PD and general contractor.
|
Application received | | | 9/26/2005 | | |
|
|
|
|