Site Final | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | PASS |
Aimee Hughes
|
|
|
Final stablization has been completed.
|
Tracking Control | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PART |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about doing some street sweeping on Colleen and Rushmore.
|
Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
Tracking Control | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PASS |
Aimee Hughes
|
|
|
Subdivision looks good. Talked to RP about posting a few ESC signs that were missing and the street sweeping shedule.
|
Tracking Control | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good. All RP information is up to date, and trackout is being maintained.
|
Issue & PRINT permit SFD | | | 11/18/2005 | | DONE |
|
|
|
|
Application received | | | 10/18/2005 | | |
|
|
|
|