Site Final | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | PASS |
Mike Jordan
|
|
|
Final stabalization complete.
|
Tracking Control | 2/7/2006 | 2/7/2006 | 2/7/2006 | P | PART |
Aimee Hughes
|
|
|
verbal c/n to RP. Sweeping schedule is not adequate, some additional clean up is going to be needed to meet MEP on trackout throughout sudivision. Contacted developer about trackout from bare lots and trackout on road/bridge extension at the end of Hollandale.
|
Tracking Control | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PASS |
Aimee Hughes
|
|
|
Subdivision looks good. Talked to RP about posting a few ESC signs that were missing and the street sweeping shedule.
|
Issue & PRINT permit SFD | | | 11/18/2005 | | DONE |
|
|
|
|
Application received | | | 10/18/2005 | | |
|
|
|
|