Site Final | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Aimee Hughes
|
|
|
|
Tracking Control | 1/23/2006 | 2/6/2006 | 2/6/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. Talked to RP about maintaining minimal trackout on Ginzel.
|
Tracking Control | 1/9/2006 | 1/23/2006 | 1/23/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Complaint Inspection | 1/6/2006 | 1/9/2006 | 1/9/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks better. Issues on c/n have been addressed. Met with RP to discuss bmp maintance.
|
Complaint Inspection | 1/6/2006 | 1/6/2006 | 1/6/2006 | P | FAIL |
Aimee Hughes
|
|
|
Responded to complaint from ACHD. met with RP to discuss bmp installation. c/n issued to address straw wattle placement, inadequate construction entrance and d/i protection. must be completed by end of weekend or a stop work may be issued. will follow up.
|
Issue & PRINT permit SFD | | | 12/13/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/9/2005 | | 12/9/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 11/29/2005 | | 11/29/2005 | | FAIL |
|
|
|
ESC plan does not meet requirments per BMC 8-17. Checklist completed and faxed to PD.
|
Application received | | | 11/14/2005 | | |
|
|
|
|