Site Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Clint A Smith
|
|
|
Work completed. CAS #460
|
Aging Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | | DEFR |
Clint A Smith
|
|
|
Moved to a site final. CAS #460
|
Permit Ready to Issue | | | 7/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2006 | | DONE |
|
|
|
Called Max and told him that permit is ready & fees///7/24/06 @ 8:55am BAS
|
Issue & PRINT permit COM | | | 7/24/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/21/2006 | | 7/21/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 7/14/2006 | | 7/17/2006 | | FAIL |
|
|
|
Recieved resubmittal - transmittal sheet, 2 copies of drainage calcs, 2 copies of erosion and sediment control plan, 5 copies of pg. C1.0 & C2.02; taken to esc
7/17/06 No ESC application included with resubmittal, notified PD.
|
Application received | | | 12/13/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/13/2005 | | 12/13/2005 | | FAIL |
|
|
|
ESC does not meet requirments per BMC 8-17. Checklist faxed to PD. Re-submittal required.
|