Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC06-00087
StatusFinaled
Name ED CONNELL
Site Address 2793 E HARD ROCK DR
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/22/20104/22/20104/22/2010APASS
DetailsDave Hannah
Aging Inspection1/27/20101/27/20101/27/2010 CANC
DetailsClint A Smith
Tracking Control4/16/20074/16/20074/16/2007PPART
DetailsAimee Hughes
Contacted RP about some minimal trackout from site and some sediment in gutters that needs addressed.
Tracking Control12/13/20061/3/20071/3/2007APART
DetailsAimee Hughes
verbal c/n to RP to address trackout from site and any trash maintenance that is needed.
Tracking Control11/20/200612/13/200612/13/2006APART
DetailsAimee Hughes
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas.
Tracking Control10/19/200611/16/200611/20/2006APASS
DetailsAimee Hughes
Site looks okay.
Tracking Control9/29/200610/20/200610/19/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control9/7/20069/28/20069/29/2006APASS
DetailsAimee Hughes
Site looks okay. Talked to RP about reposting ESC sign.
Tracking Control9/5/20069/7/20069/7/2006APART
DetailsAimee Hughes
Site looks okay, talked to RP about some minimal trackout and a bit of maintenance needed on that d/i.
Site Preparation9/5/20069/5/20069/5/2006PCANC
DetailsAimee Hughes
Site Final9/5/20069/5/20069/5/2006PCANC
DetailsAimee Hughes
Site Preparation8/30/20069/1/20069/5/2006ACANC
DetailsAimee Hughes
Tracking Control5/26/20065/30/20065/30/2006APASS
DetailsAimee Hughes
John Ryan will be going to city hall to get his interim RP certification today and will then update RP on permit.
BMP Violation5/25/20065/26/20065/26/2006APASS
DetailsAimee Hughes
Issues on c/n have been addressed. RP listed on sign is not certified, contacted John Ryan about getting interim RP certification. Must be completed by 5/30/06.
BMP Violation5/25/20065/25/20065/25/2006PFAIL
DetailsSteven Webb
Correction to rp and contractor. Blantant violation of construction project. Compliance to project by the end of the day or a stop work order will be issued on Friday 5/26/06.
Tracking Control4/28/20065/19/20065/19/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control4/7/20064/28/20064/28/2006APASS
DetailsAimee Hughes
Site looks good. All bmp's are being maintained.
Tracking Control3/16/20064/7/20064/12/2006ACANC
DetailsAimee Hughes
Tracking Control3/16/20063/16/20063/16/2006PCANC
DetailsAimee Hughes
Issue & PRINT permit SFD  3/3/2006 DONE
Routing - Erosion and Sediment2/15/2006 2/15/2006 PASS
ESC plan approved with attached conditions.
Application received  1/25/2006