Site Final | 4/22/2010 | 4/22/2010 | 4/22/2010 | A | PASS |
Dave Hannah
|
|
|
|
Aging Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 | | CANC |
Clint A Smith
|
|
|
|
Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PART |
Aimee Hughes
|
|
|
Contacted RP about some minimal trackout from site and some sediment in gutters that needs addressed.
|
Tracking Control | 12/13/2006 | 1/3/2007 | 1/3/2007 | A | PART |
Aimee Hughes
|
|
|
verbal c/n to RP to address trackout from site and any trash maintenance that is needed.
|
Tracking Control | 11/20/2006 | 12/13/2006 | 12/13/2006 | A | PART |
Aimee Hughes
|
|
|
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas.
|
Tracking Control | 10/19/2006 | 11/16/2006 | 11/20/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 9/29/2006 | 10/20/2006 | 10/19/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 9/7/2006 | 9/28/2006 | 9/29/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay. Talked to RP about reposting ESC sign.
|
Tracking Control | 9/5/2006 | 9/7/2006 | 9/7/2006 | A | PART |
Aimee Hughes
|
|
|
Site looks okay, talked to RP about some minimal trackout and a bit of maintenance needed on that d/i.
|
Site Preparation | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Site Final | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Site Preparation | 8/30/2006 | 9/1/2006 | 9/5/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Aimee Hughes
|
|
|
John Ryan will be going to city hall to get his interim RP certification today and will then update RP on permit.
|
BMP Violation | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | PASS |
Aimee Hughes
|
|
|
Issues on c/n have been addressed. RP listed on sign is not certified, contacted John Ryan about getting interim RP certification. Must be completed by 5/30/06.
|
BMP Violation | 5/25/2006 | 5/25/2006 | 5/25/2006 | P | FAIL |
Steven Webb
|
|
|
Correction to rp and contractor. Blantant violation of construction project. Compliance to project by the end of the day or a stop work order will be issued on Friday 5/26/06.
|
Tracking Control | 4/28/2006 | 5/19/2006 | 5/19/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 4/7/2006 | 4/28/2006 | 4/28/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 3/16/2006 | 4/7/2006 | 4/12/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 3/16/2006 | 3/16/2006 | 3/16/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Issue & PRINT permit SFD | | | 3/3/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/15/2006 | | 2/15/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 1/25/2006 | | |
|
|
|
|