Permit NumberESC06-00149
StatusFinaled
Name THOMAS CALLSEN
Site Address 465 W GOWEN RD
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/23/200710/23/200710/23/2007PPASS
DetailsAimee Hughes
Final stabilization has been completed.
Conference10/16/200610/16/200610/16/2006PPART
DetailsAimee Hughes
met with RP to discuss taking down access control fence along gowen road to get ready for landscaping activity. Site looks good. Suggested that he added a top dressing to the construction entrance and that dust control was addressed and maintained regularly.
Tracking Control9/6/20069/27/20069/27/2006APASS
DetailsAimee Hughes
Site looks good, all bmp's are being maintained.
Tracking Control9/5/20069/6/20069/6/2006APART
DetailsAimee Hughes
Met with RP to discuss new construction entrance being used and making sure that it is properly marked and old construction entrance is blocked off to avoid any trackout onto Gowen rd.
Tracking Control8/16/20069/5/20069/5/2006ACANC
DetailsAimee Hughes
Tracking Control7/27/20068/17/20068/16/2006ACANC
DetailsAimee Hughes
Tracking Control7/6/20067/27/20067/27/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control6/22/20067/6/20067/6/2006APASS
DetailsAimee Hughes
Site looks good.
Tracking Control6/19/20066/19/20066/22/2006PPASS
DetailsAimee Hughes
Site looks good all bmp's are being maintained.
Tracking Control5/26/20066/16/20066/19/2006ACANC
DetailsAimee Hughes
Tracking Control5/4/20065/25/20065/26/2006APASS
DetailsAimee Hughes
Site looks good. Construction entrance has been recently redressed and all other bmp's are being maintained.
Site Preparation5/1/20065/3/20065/4/2006APASS
DetailsAimee Hughes
Site looks okay. Issues on c/n have been addressed. Asked the RP to a some more top dressing to his construction entrance.
Site Preparation4/28/20065/1/20065/1/2006PPART
DetailsSteven Webb
Correction to c/m.
Site Preparation4/25/20064/28/20064/28/2006APART
DetailsSteven Webb
Partial implementation of bmp observed but additional controls appear to be needed will follow up 1st week in May.
Routing - Erosion and Sediment4/28/2006 4/28/2006 DONE
Received intent to start construction and change of rp from L. Smith to Tom Callsen.
Random Inspection4/25/20064/25/20064/25/2006PFAIL
DetailsSteven Webb
Earthmoving equipment on site, bare access entrance, no signage, no bmp's. Informed contractor that no work is allowed until plan conditions are in place including signage.
Issue & PRINT permit COM  4/25/2006 DONE
Routing - Erosion and Sediment2/10/2006 2/10/2006 PASS
ESC plan approved with attached conditions.
Application received  2/3/2006