Site Final | 2/10/2011 | 2/10/2011 | 2/10/2011 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/10/2011 | 2/10/2011 | 2/10/2011 | P | PASS |
Mike Jordan
|
|
|
Final stabalization has been completed.
|
Random Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Mike Jordan
|
|
|
Final stabalization has been completed, but still noted construction activities.
|
Random Inspection | 1/11/2011 | 1/11/2011 | 1/11/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 10/5/2010 | 10/5/2010 | 10/5/2010 | A | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 9/28/2010 | 9/28/2010 | 9/28/2010 | | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/27/2010 | 7/28/2010 | 7/28/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: 1. CLean up all hard surfaces of all sediment and debris. 2. Install a sediment barrier along the perimeter of the pond at the corner of Hiawathia and Gatewood. Failure to comply by 7/29/10am will result in a stop work order. Will re-inspect on 7/29/10pm.
|
Complaint Inspection | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: CLean up all gutter pans with the construction site of all sediment and debris including but not limited to the concrete residual. Install a sediment barrier along the disturbed soil at the pnd arar to the south of the vertical construction. Also provide storm drain inlet protection aat the storm drain located at the corner of Hiwatha and Gatewood. Will re-inspect on 7/28/10 PM.
|
Change Status (ISS) | | | 7/27/2010 | | DONE |
|
|
|
per clint
|
Aging Inspection | 7/19/2010 | 7/19/2010 | 7/19/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 7/19/2010 | 7/19/2010 | 7/19/2010 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/18/2010 | 5/18/2010 | 5/18/2010 | A | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 5/11/2010 | 5/11/2010 | 5/11/2010 | | PASS |
Mike Jordan
|
|
|
Work is still in progress.
|
Random Inspection | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 3/3/2010 | 3/4/2010 | 3/4/2010 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. BMP's in place. No concrete washout required due to size and scope of work.
|
(F) Reprint permit | | | 2/25/2010 | | DONE |
|
|
|
|
Aging Inspection | 2/9/2010 | 2/9/2010 | 2/10/2010 | | PART |
Mike Jordan
|
|
|
Noted that some construction activity has begun. Permit has been changed to new contractor and RP. Called and left verbal c/n to RP on awnser machine to provide ESC prmit sign, BMP's and washout area.
|
Change Status (ISS) | | | 2/3/2010 | | DONE |
|
|
|
reopen permit and charge xfer fee per SGW
|
Aging Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | | DONE |
Clint A Smith
|
|
|
|
Site Final | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PASS |
Clint A Smith
|
|
|
Permit expired
|
Issue & PRINT permit SFD | | | 4/14/2006 | | DONE |
|
|
|
|
Application received | | | 3/28/2006 | | |
|
|
|
|