Site Final | 10/31/2007 | 10/31/2007 | 10/31/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 7/31/2006 | 8/14/2006 | 8/15/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 7/31/2006 | 8/14/2006 | 8/15/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 7/31/2006 | 7/31/2006 | 7/31/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 7/14/2006 | 7/28/2006 | 7/31/2006 | A | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. if driveway is going to be used as main access a construction entrance needs to be installed, some of the wattles need to be maintained, and d/i right at mailbox needs to be maintained.
|
Tracking Control | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Issue & PRINT permit SFD | | | 5/5/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/24/2006 | | 4/24/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 4/13/2006 | | |
|
|
|
|