Site Final | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
James Rogers
|
|
|
|
BMP Violation | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. mud and dirt in gutter from landscaping must be cleaned up.
|
Tracking Control | 12/7/2006 | 12/7/2006 | 12/7/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 10/24/2006 | 11/14/2006 | 11/14/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All issues on previous c/n have been addressed and are being maintained.
|
Tracking Control | 10/24/2006 | 11/14/2006 | 11/14/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Tracking Control | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP, silt fence behind house on slope needs to be repaired, and dumpster is overflowing with trash.
|
Tracking Control | 8/29/2006 | 9/12/2006 | 9/12/2006 | A | PART |
Aimee Hughes
|
|
|
Site looks okay, contacted RP about re-posting ESC sign.
|
Tracking Control | 8/8/2006 | 8/29/2006 | 8/29/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Issue & PRINT permit SFD | | | 5/17/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/27/2006 | | 4/27/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 4/18/2006 | | |
|
|
|
|