Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC06-00686
StatusFinaled
Name DAN JAFEK
Site Address 3823 N 36TH ST
Project Name36th STREET GARDEN CENTER
Customer Number 
ePlanReview 
Description
garden plaza sub
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection11/15/201011/15/201011/15/2010 DONE
DetailsClint A Smith
DOC - Permit Finaled11/15/201011/15/201011/15/2010PPASS
DetailsClint A Smith
Garden Centre has been stabilized where all vacent lot are at. Utilized 2inch washed rock and broadcasted seed.
Aging Inspection9/15/20109/15/20109/16/2010 DONE
DetailsClint A Smith
Still in the process of final stabilization on there building pads.
Aging Inspection7/12/20107/12/20107/13/2010 PASS
DetailsDixie Fellows
Conference5/11/20105/11/20105/12/2010PPASS
DetailsClint A Smith
Aging Inspection5/10/20105/10/20105/11/2010 PEND
DetailsDixie Fellows
sent to clint
Aging Inspection2/26/20102/26/20102/26/2010 DONE
DetailsClint A Smith
Project in a hold but still active.
Conference9/22/20089/22/20089/22/2008ADONE
DetailsClint A Smith
BMP Violation4/16/20084/18/20084/18/2008PPASS
DetailsClint A Smith
Hydro seed or Hydro staw has been applied to all disturbed area that will be dormit.
CAS
#460
Site Preparation4/16/20084/16/20084/16/2008PCANC
DetailsClint A Smith
BMP Violation4/16/20084/16/20084/16/2008PFAIL
DetailsClint A Smith
Notice of Correction
Stabilize all disturbed soil/ stockpiles on project that have been or will be dormit 30 days.
Will re-inspect on Friday the 04/18/08
CAS
#460
Site Preparation4/7/20084/14/20084/16/2008ACANC
DetailsJames Rogers
Site Preparation3/31/20084/7/20084/7/2008AFAIL
DetailsJames Rogers
Phone #: ###-####
Random Inspection3/31/20083/31/20083/31/2008PPASS
DetailsJames Rogers
No site issues.; Phone #: ###-####
Random Inspection3/26/20083/26/20083/26/2008PPART
DetailsClint A Smith
Started to install BMP's for further protection. Told them that the construction entrances must be min. 50ft in length. Also they will be hydro seeding next week to stabilize stock pile and bare soil.
CAs#460
Conference3/24/20083/24/20083/24/2008PDONE
DetailsClint A Smith
On 4/ 21/08,CAS & SGW discussed with the RP about temporary entrances, access control stock pile stabilizing after 14 days and also Drain protection at the North east area of project. Will check up later on what has occured with the project.
CAS#460
SGW#420
Tracking Control8/17/20079/3/20079/4/2007APART
DetailsAimee Hughes
verbal c/n to RP about equipment staged on lot adjacent to site. equipment has been removed and an adequate construction entrance will be installed if lot is used again.
Tracking Control8/17/20078/17/20078/17/2007PPART
DetailsAimee Hughes
Met with RP to discuss issues from prior verbal c/n. Access control has been installed, sediment barriers have been installed, d/i's have been cleaned out, outlet protection has been installed. RP is currently getting bids for temporary stabilization. He will contact me when bids are complete and tactifier is scheduled.
Random Inspection8/14/20078/14/20078/14/2007AFAIL
DetailsSteven Webb
Needs drop inlet protection, access controls, and site stablized.
Tracking Control12/6/200612/27/200612/27/2006ACANC
DetailsAimee Hughes
Tracking Control11/13/200612/4/200612/6/2006APASS
DetailsAimee Hughes
Site looks good, all bmp's are being maintained.
Tracking Control10/25/200611/17/200611/17/2006APASS
DetailsAimee Hughes
Conference11/8/200611/13/200611/13/2006APASS
DetailsAimee Hughes
Met with RP to discuss change to BMP's called out on the plan. Changing access control and construction entrance. Reminded RP to note any changes he makes on his stamped drawing.
Conference11/8/200611/8/200611/8/2006PCANC
DetailsAimee Hughes
Conference11/6/200611/7/200611/7/2006APASS
DetailsAimee Hughes
Met with RP to inspect site to approved ESC plan.
Tracking Control10/25/200610/31/200611/1/2006APASS
DetailsAimee Hughes
Complaint Inspection10/25/200610/25/200610/25/2006PPART
DetailsAimee Hughes
Responded to citizen complaint regarding trackout from site onto 36th. Met with RP and inspected site to approved ESC plan. Pit run is in place on all entrances and road is being put in this week. Informed RP that all employees must be parking off site to avoid any trackout problems while roads are being installed. Notified complaintant of action taken.
Tracking Control6/7/20066/28/20066/28/2006APASS
DetailsAimee Hughes
Site looks good. All bmp's are being maintained.
Tracking Control5/9/20066/6/20066/7/2006APASS
DetailsAimee Hughes
Site looks fine, all bmp's are being maintained. Met with RP to discuss some bmp changes.
Complaint Inspection5/16/20065/16/20065/17/2006PPASS
DetailsAimee Hughes
Met with RP to discuss dust complaint. Water truck is on site and MEP is being met as far as dust control is concerned.
Conference5/9/20065/9/20065/9/2006PPASS
DetailsAimee Hughes
Met with RP to inspection site to approved plans and discuss some possible bmp changes in the plans.
Telephone call  4/27/2006 DONE
left mess that permit is ready
Permit Ready to Issue  4/27/2006  
Issue & PRINT permit COM  4/27/2006 DONE
Routing - Erosion and Sediment4/24/2006 4/24/2006 PASS
ESC plan approved with attached conditions.
Routing - Erosion and Sediment4/21/2006 4/21/2006 FAIL
No esc application included with plan. Informed applicant. No review took place.
Application received  4/20/2006  
Routing - Erosion and Sediment4/20/2006   PEND