Site Final | 2/2/2009 | 2/2/2009 | 2/2/2009 | P | PASS |
James Rogers
|
|
|
|
Tracking Control | 2/20/2007 | 3/13/2007 | 3/14/2007 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay, all bmp's are being maintained.
|
Tracking Control | 1/23/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 1/2/2007 | 1/23/2007 | 1/23/2007 | A | PART |
Aimee Hughes
|
|
|
Site looks okay, talked to RP about some maintenance needed to the d/i protection.
|
Tracking Control | 12/12/2006 | 1/2/2007 | 1/2/2007 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 11/27/2006 | 12/11/2006 | 12/12/2006 | A | PART |
Aimee Hughes
|
|
|
Called RP about making sure that all bmp's are inspected and maintained, especially during the heavy rainfall we're having.
|
Tracking Control | 10/27/2006 | 11/20/2006 | 11/27/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 10/6/2006 | 10/27/2006 | 10/27/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 9/15/2006 | 10/6/2006 | 10/6/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 8/31/2006 | 9/15/2006 | 9/15/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. Contacted RP about making sure that no track out occurs after backfilling is completed.
|
Tracking Control | 8/10/2006 | 8/31/2006 | 8/31/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 7/20/2006 | 8/10/2006 | 8/10/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good. All bmp's are being maintained.
|
Tracking Control | 7/13/2006 | 7/20/2006 | 7/20/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Site Preparation | 7/11/2006 | 7/14/2006 | 7/14/2006 | A | CANC |
Aimee Hughes
|
|
|
|
Site Preparation | 7/12/2006 | 7/12/2006 | 7/13/2006 | P | PART |
Aimee Hughes
|
|
|
Construction has just started and sediment barriers are in place. Spoke with RP about posting ESC sign and installing d/i protection down the hill from the site.
|
48 hr start notification | | | 7/11/2006 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 7/5/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2006 | | 5/16/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 5/11/2006 | | |
|
|
|
|