Aging Inspection | 3/10/2010 | 3/10/2010 | 3/10/2010 | | PASS |
Bill VanDegrift
|
|
|
|
Site Final | 3/10/2010 | 3/10/2010 | 3/10/2010 | P | PASS |
Bill VanDegrift
|
|
|
|
Tracking Control | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | PART |
Aimee Hughes
|
|
|
Construction is underway. Talked to RP about watching track out from site and making sure that appropriate sediment barriers are in place.
|
Tracking Control | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | PASS |
Aimee Hughes
|
|
|
Contacted RP about status of project and to make sure that the bare soil is stabilized within 30 days of inactivity.
|
BMP Violation | 7/25/2007 | 7/25/2007 | 7/25/2007 | P | PART |
Steven Webb
|
|
|
Correction to owner: Bare ground exceeding 30 days on site. Needs to stablize if further work has not started in 2 weeks. Signage needed. Will follow up.
|
Tracking Control | 10/30/2006 | 10/30/2006 | 10/30/2006 | P | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 9/19/2006 | 10/10/2006 | 10/9/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay, all bmp's are being maintained.
|
Tracking Control | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Aimee Hughes
|
|
|
Called all RP's in subdivision to remind them to make sure all bmp's are in place and being maintained. Some minimal trackout needs to be addressed and some ESC signs need to be posted.
|
Issue & PRINT permit SFD | | | 7/27/2006 | | DONE |
|
|
|
|
Application received | | | 7/13/2006 | | |
|
|
|
|