Site Final | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | PASS |
Clint A Smith
|
|
|
Site stabilized with final landscaping. CAS #460
|
BMP Violation | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | PART |
Aimee Hughes
|
|
|
Issues on c/n have been addressed, except for updated RP information. Notified RP listed on permit to update information by the end of the day.
|
BMP Violation | 3/5/2007 | 3/6/2007 | 3/5/2007 | P | CANC |
Steven Webb
|
|
|
Follow up: After Lunch inspection:
Re-inspection has been transfered to inspector #436.
|
Random Inspection | 3/2/2007 | 3/2/2007 | 3/2/2007 | P | FAIL |
Steven Webb
|
|
|
Correction notice issued. Complete by noon on 3-6-07 or further enforcement will occur.
|
Conference | 1/8/2007 | 1/8/2007 | 1/8/2007 | | DONE |
|
|
|
Discussed issues on site with listed RP-B. Davis. Reminded him that per ordinance that the RP is required to have day-to-day control over project.
|
BMP Violation | 12/28/2006 | 12/28/2006 | 12/28/2006 | A | FAIL |
Steven Webb
|
|
|
Correction to contractors; (Inspection took place the afternoon of 12/27/06) -- Dave Evans and Hard Rock. 4" or mud track onto hard surfaces with unprotected d.inlets. No Signage, or other plan bmp's observed. Keith (Dave Evans) not the rp that is listed on permit.
|
Issue & PRINT permit COM | | | 11/21/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/2/2006 | | 10/2/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 9/28/2006 | | |
|
|
|
|