DOC - Permit Finaled | 5/21/2009 | 5/21/2009 | 5/21/2009 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP. access control along Baron needs to be repaired and ESC sign needs to be reposted.
|
Site Preparation | 4/3/2007 | 4/3/2007 | 4/4/2007 | P | PASS |
Aimee Hughes
|
|
|
received 48 hr. notice. excavation is just set to begin. contacted RP about getting bmp's in place.
|
Issue & PRINT permit COM | | | 3/29/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/2/2007 | | 3/2/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Telephone call | | | 3/2/2007 | | DONE |
|
|
|
called ###-#### Randy Schultz, and told him permit is ready and fees
|
Permit Ready to Issue | | | 3/2/2007 | | DONE |
|
|
|
|
Application received | | | 3/1/2007 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/1/2007 | | | | PEND |
|
|
|
|