Site Final | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 7/14/2009 | 7/14/2009 | 7/14/2009 | P | PART |
Jim Sly
|
|
|
OK
|
General Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 4/10/2009 | 4/13/2009 | 4/13/2009 | P | PART |
Clint A Smith
|
|
|
Discussed with RP over disturbed area next to canal. RP explained to me that he will be spreading mulch along the area's next to the canal for ground coverage.
|
Conference | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PART |
Eric Strole
|
|
|
unable to contact rp, went over bmp's required along ditch & the need for a trash container with gc.
|
Issue & PRINT permit SFD | | | 5/9/2007 | | DONE |
|
|
|
|
Application received | | | 3/19/2007 | | |
|
|
|
|