General Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | | DONE |
Steven Webb
|
|
|
Permit doc-finaled.
|
DOC - Permit Finaled | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Steven Webb
|
|
|
Site development achieved final stabilization. NOT is filed as well.
|
General Inspection | 5/12/2011 | 5/12/2011 | 5/12/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
General Inspection | 4/27/2011 | 4/27/2011 | 4/27/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | | PASS |
Steven Webb
|
|
|
No change but not ready to final.
|
General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 | | PART |
Steven Webb
|
|
|
Misc debris appears to have been dumped but no construction activities is occurring. No apparent problems observed.
|
General Inspection | 3/3/2011 | 3/3/2011 | 3/3/2011 | | PASS |
Steven Webb
|
|
|
No change from last inspection, no activity noticed and no problems observed.
|
General Inspection | 2/16/2011 | 2/16/2011 | 2/16/2011 | | PASS |
Steven Webb
|
|
|
No changes from last inspection, no problems observed.
|
General Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/17/2011 | 1/17/2011 | 1/18/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 12/31/2010 | 12/31/2010 | 1/3/2011 | | CANC |
Steven Webb
|
|
|
HOLIDAY
|
General Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | | PASS |
Steven Webb
|
|
|
Sign posted, misc areas have been sodded, (common areas) and other areas have natural vegetation. Minimal areas are denuded. No problems observed.
|
General Inspection | 10/27/2010 | 10/27/2010 | 10/27/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/27/2010 | 9/29/2010 | 9/29/2010 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Recolate the pile of pit run that was placed on the property to the east of his project area. He said that it will be taken care of by tomorrow afternoon. Will follow up on 9/29/2010am
|
General Inspection | 9/20/2010 | 9/20/2010 | 9/20/2010 | A | PASS |
Clint A Smith
|
|
|
Completing sidewalks and street repairs through out project. Site looks good. Will be providing a washout for concrete prior to the pour date.
|
Site Preparation | 6/11/2009 | 6/25/2009 | 6/25/2009 | A | NR |
Clint A Smith
|
|
|
Waiting on RP to contact us with a start date.
|
(F) Reprint permit | | | 6/15/2009 | | DONE |
Tisha Gallop
|
|
|
paid for addendum
|
Routing - Erosion and Sediment | 6/11/2009 | | 6/11/2009 | | PASS |
Steven Webb
|
|
|
Received revised application addendum which increases the area of disturbance from 9.95 to 11.1 acres. Additional fee of $52.50 is required. Approved based on original ESC plan and permit conditions.
|
Telephone call | | | 6/11/2009 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Carrie Huston with CBH that permit is ready for them to pick up and there are additional fees due///6-11-09 @ 8:39am BAS
|
Telephone call | | | 6/11/2009 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Jim Conger that permit is ready to be picked up and the addtional fees are due///6-11-09 @ 8:40am BAS
|
General Inspection | 7/29/2008 | 7/29/2008 | 7/30/2008 | P | PASS |
Steven Webb
|
|
|
No evidence of work being done.
|
Issue & PRINT permit COM | | | 3/30/2007 | | DONE |
|
|
|
|
Application received | | | 3/29/2007 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/29/2007 | | 3/29/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Telephone call | | | 3/29/2007 | | |
|
|
|
called john tansey ###-#### to verify plans are ready
|
Permit Ready to Issue | | | 3/29/2007 | | DONE |
|
|
|
|