Aging Inspection | 6/11/2010 | 6/11/2010 | 6/11/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 6/11/2010 | 6/11/2010 | 6/11/2010 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 1/13/2009 | 1/14/2009 | 1/14/2009 | A | PASS |
Eric Strole
|
|
|
|
BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PART |
Clint A Smith
|
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
Site Preparation | 3/6/2008 | 3/7/2008 | 3/6/2008 | A | CANC |
Clint A Smith
|
|
|
|
BMP Violation | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Clint A Smith
|
|
|
**Notice of Correction** -Heavy sediment tracking on Garverdale and Wildwood -Trash debris not in container around lots -No Sediment BMP's inplace -No construction entrance to lots -No concrete washout pit Failure to comply by 3/7/08 will result in a stop work order. Will re-inspect on 3/7/08 CAS#460 ###-####
|
Issue & PRINT permit COM | | | 8/23/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/12/2007 | | 6/12/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions. Refer to ESC07-00661 as master ESC plan.
|
Application received | | | 5/25/2007 | | |
|
|
|
|