Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberESC07-00751
StatusFinaled
Name DAISY GLENN
Site Address 5251 N ARROW CREST WAY
Project NameANGORA SUB #1
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection12/6/201012/6/201012/6/2010 DONE
DetailsClint A Smith
DOC - Permit Finaled12/6/201012/6/201012/6/2010PPASS
DetailsClint A Smith
Aging Inspection10/4/201010/4/201010/4/2010 PASS
DetailsDaryl Spivey
Aging Inspection8/4/20108/4/20108/4/2010 DONE
DetailsClint A Smith
Aging Inspection6/4/20106/4/20106/4/2010 PASS
DetailsClint A Smith
Site is still in active vertical construction.
Random Inspection12/17/200812/17/200812/17/2008PPASS
DetailsClint A Smith
No activity
BMP Violation10/16/200810/20/200810/20/2008PPART
DetailsClint A Smith
Still need to protect the water channel at the East end of sub divios where the slope was disturbed and seed was spread. Will need to kept protected until the seed takes.
BMP Violation10/14/200810/16/200810/16/2008PFAIL
DetailsClint A Smith
Spoke with the sub division owner due to the family emergency the RP had to take care of. Showed him the concern of violation with the prior correction notice. Wil have it partly done on 10/17/08 and fully complete on 10/20/08.
Will re-inspect on 10/20/08.
General Inspection10/14/200810/14/200810/14/2008AFAIL
DetailsClint A Smith
Left a message for RP to contact me.
Correction Notice:
1. Maintain and Install BMP's on project area where slopes are over 2% grade.
2. Protect and/or stabilize slopes at the front & back of lots and by the canal.
3. Clean up and remove all trash debris on the sub divisions.
4. Clean up all tracking in the sub division streets.
Failure to comply will result in a Stop Work Order. Will re-inspect on 10/16/08 PM.
Random Inspection8/13/20088/13/20088/13/2008PPASS
DetailsClint A Smith
General Inspection7/21/20087/21/20087/21/2008PPASS
DetailsClint A Smith
Site is looking good. No issues present.
CAS
General Inspection5/30/20085/30/20085/30/2008APART
DetailsSteven Webb
Verbal correction to rp; Needs top dressing on construction entrance. Inquired regarding slopes, if ready they need to re-seed sooner rather than later.
Tracking Control5/27/20085/27/20085/27/2008AFAIL
DetailsClint A Smith
Clean up tracking off of project area and on to streets by the end of the day. Left a message for the RP over the issue.
CAS
#460
Random Inspection5/23/20085/23/20085/23/2008APASS
DetailsClint A Smith
Site looks good. All BMP's are in good shape. No tracking.
CAS
#460
Tracking Control5/9/20085/12/20085/12/2008APART
DetailsClint A Smith
Track has been cleaned up and entrance was extended on project area.
Where they are pulling dirt off of on the other side of the hill, minor tracking. Left a message with the RP over the project and discussed with the contractor over the issues also.
CAS
#460
Complaint Inspection5/9/20085/9/20085/9/2008AFAIL
DetailsClint A Smith
Notice of Correction
Heavy tracking coming off of project area.
Tracking also off of area where they are pulling dirt on the other side of the hill for back fill for the project area. Discussed with RP over the issue making sure it gets cleaned up.
Will re-inspect on Monday in the AM
CAS
#460
Site Preparation4/17/20084/18/20084/18/2008APART
DetailsClint A Smith
Need to Re-install Bmps to proect channel and install DI protection. Met with the 3rd party consultant over project start-up
CAS
#460
Issue & PRINT permit COM  6/21/2007 DONE
Routing - Erosion and Sediment6/15/2007 6/15/2007 PASS
ESC plan approved with attached conditions.
Telephone call  6/15/2007 DONE
left mess for colin connell ###-#### that permit ready
Application received  6/13/2007  
Routing - Erosion and Sediment6/13/2007 6/13/2007 FAIL
ESC plan failed. ESC application has not been completed. ESC plans are in ESC pending box.
Routing - Erosion and Sediment6/13/2007   PEND