Site Final | 8/1/2007 | 8/1/2007 | 8/1/2007 | P | PASS |
Aimee Hughes
|
|
|
|
Site Final | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | FAIL |
Aimee Hughes
|
|
|
left vm for RP. access control needed from lot onto Nez Perce and some street sweeping is needed. Also want to know the status of rebuilding or stablization plans.
|
Site Final | 7/25/2007 | 7/25/2007 | 7/26/2007 | P | CANC |
Aimee Hughes
|
|
|
|
Issue & PRINT permit SFD | | | 7/24/2007 | | DONE |
|
|
|
|
Application received | | | 6/29/2007 | | |
|
|
|
|