Site Final | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PASS |
James Rogers
|
|
|
|
Site Preparation | 6/9/2008 | 6/11/2008 | 6/11/2008 | A | PASS |
Clint A Smith
|
|
|
Recommend the protection of swale with some type of sediment barrier at the toe of the slope. Waether permitting. AL in all site looks good. Drian protection is incorrect but ACHD permit inspector has given the ok on it. CAS #460
|
48 hr start notification | | | 6/9/2008 | | |
|
|
|
|
Issue & PRINT permit COM | | | 9/27/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/8/2007 | | 8/8/2007 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Application received | | | 8/2/2007 | | |
|
|
|
|