Site Final | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PASS |
Clint A Smith
|
|
|
All work is complete. Final landscaping is installed. CAS #460
|
Site Preparation | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Clint A Smith
|
|
|
Explained to Brett about sediment on sidewalks and street needs to be swept. Also reccommend a plastic liner in the concrete washout and a curb or something to block runoff from entering the gutter.
|
BMP Violation | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PART |
Steven Webb
|
|
|
|
BMP Violation | 2/13/2008 | 2/15/2008 | 2/15/2008 | A | CANC |
Clint A Smith
|
|
|
See correction notice dated 2-11-08 and inspection dated 2-13. Site still not in compliance this date.; Phone #: ###-####
|
BMP Violation | 2/15/2008 | 2/15/2008 | 2/15/2008 | P | PASS |
Clint A Smith
|
|
|
All solid waste derbis has been removed from lot. Sign posted in front of lot. All tracking cleaned up coming from lot. Stil reccomend a Safety barrier to block access to lot.
|
Complaint Inspection | 2/11/2008 | 2/13/2008 | 2/13/2008 | P | FAIL |
James Rogers
|
|
|
RP is Tim Behrman - ###-####. No work has been done to bring this site into compliance.
|
Conference | 2/12/2008 | 2/12/2008 | 2/12/2008 | A | DONE |
James Rogers
|
|
|
|
Random Inspection | 2/11/2008 | 2/11/2008 | 2/11/2008 | A | FAIL |
James Rogers
|
|
|
Contacted RP No Sign, Mud and dirt trackout, no BMP for solid waste disposal. Gave until 2/13 (PM) to bring site into complieance or stop work will be issued.
CBH indicates Tim Behrman is RP for this site.; Phone #: ###-####
|
Issue & PRINT permit SFD | | | 9/28/2007 | | DONE |
|
|
|
|
Application received | | | 9/13/2007 | | |
|
|
|
|