DOC - Permit Finaled | 12/23/2009 | 12/23/2009 | 12/23/2009 | P | PASS |
Troy James
|
|
|
|
BMP Violation | 9/2/2008 | 9/5/2008 | 9/5/2008 | A | PART |
Clint A Smith
|
|
|
Need to free up sediment from the gutterpan where the turn around is installed. CAS
|
BMP Violation | 8/27/2008 | 9/1/2008 | 9/2/2008 | A | FAIL |
Clint A Smith
|
|
|
Wattle was installed incorrectly. Still has heavy amounts of sediemnt on the sidewalk. Left a message with the RP to have it corrected by 9/5/08. CAS
|
BMP Violation | 8/22/2008 | 8/27/2008 | 8/27/2008 | A | FAIL |
Clint A Smith
|
|
|
Notice of Correction. 1. Install sediment protection in the back of the project where the stock pile of dirt is along the road way. 2. Remove all sediment and debris from all hard surface in the back part of the project area. 3. Maintain D.I. throughout the project area. Failure to complt with the notice will result in a Stop Work Order. Must be corrected by 8/28/08 PM. Will re-inspect on 7/1/08 CAS
|
BMP Violation | 8/20/2008 | 8/22/2008 | 8/22/2008 | A | FAIL |
Clint A Smith
|
|
|
In the process of removing the dirt along the curb. No bmp's in place yet will check on 8/27/08. In not completed a Notice will be written. CAS
|
BMP Violation | 8/14/2008 | 8/20/2008 | 8/20/2008 | A | DEFR |
Clint A Smith
|
|
|
Spoke with RP over the stabilizing. Will be completed by tomorrow at the latest. Will re-inspect on 8/22/08 CAS
|
BMP Violation | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | FAIL |
Clint A Smith
|
|
|
In the south wst area of project next to the access road to the dam, thye slope that are sitting more than 2% need to be either stabilized of have some type of approved sediment barrier installed. Left a message with the RP to contact me to discuss the issues. Will re-inspect on 8/20/08 CAS
|
Random Inspection | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | CANC |
Clint A Smith
|
|
|
Streets have been cleaned up after the treess were planted. CAS
|
General Inspection | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PART |
Clint A Smith
|
|
|
Stock pile is going to be used for fill in the phase 10 patrail of the developement. Will be starting soon on the fill part. Told Rp that protection at the bottom of slope will be need, weather permitting. CAS #460
|
General Inspection | 5/7/2008 | 5/7/2008 | 5/7/2008 | A | PASS |
Clint A Smith
|
|
|
Site looks good. Getting ready to pave streets. CAS #460
|
Conference | 2/13/2008 | 2/13/2008 | 2/13/2008 | A | PART |
Steven Webb
|
|
|
10:30
|
Random Inspection | 2/8/2008 | 2/8/2008 | 2/8/2008 | A | FAIL |
Steven Webb
|
|
|
Noticed land disturbing activities on 2/7/08: Further investigation revealed working without active permit. ESC plan has been reviewed and pass but has not been picked up by applicant. Applicant was informed that this permit is required to be picked up and plan & conditions implemented prior to further activities can commence.
|
Issue & PRINT permit SFD | | | 2/8/2008 | | DONE |
|
|
|
|
Telephone call | | | 11/5/2007 | | DONE |
|
|
|
called ###-#### and talked to receptionist for Jay Walker that permit is ready and fees
|
Routing - Erosion and Sediment | 10/8/2007 | | 10/8/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Telephone call | | | 10/8/2007 | | DONE |
|
|
|
called ###-#### and left voice message for Jay Walker that permit is ready and fees
|
Permit Ready to Issue | | | 10/8/2007 | | DONE |
|
|
|
|
Application received | | | 10/4/2007 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/4/2007 | | | | PEND |
|
|
|
|