Site Final | 7/29/2008 | 7/29/2008 | 7/29/2008 | P | PASS |
Steven Webb
|
|
|
|
Site Final | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | PASS |
Clint A Smith
|
|
|
Site is stabilized. Works has been completed. CAS #460
|
Site Preparation | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | CANC |
Clint A Smith
|
|
|
Installed a sediment barrier (wattle) along the creek area to stop anytype of sediment from going into. CAS#460 ###-####
|
Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PART |
Clint A Smith
|
|
|
Verbal Notice of Correction Need to get a sediment barrier next to the creek are of lot. Due to slope greater than 2% a barrier is needed to protect the creek. Will re-inspect on Monday 2/25/08
CAS#460 ###-####
|
Site Preparation | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | CANC |
Clint A Smith
|
|
|
Not a site prep.
|
Issue & PRINT permit SFD | | | 10/19/2007 | | DONE |
|
|
|
|
Application received | | | 10/8/2007 | | |
|
|
|
|